Event / Science

Artemis II Lunar Mission

← All events

Updated

NASA's Artemis II crewed lunar mission, featuring astronauts Reid Wiseman, Victor Glover, Christina Koch, and Jeremy Hansen completing a historic flight around the moon with safe return to Earth.

3 reported locations
Geography of the reported facts
  1. San Diego, California, United States
  2. Spaceport America Boulevard, Truth or Consequences, New Mexico 87901, United States
  3. Moon Township, Pennsylvania, United States

The story so far

Daily activity

0 articles
0 articles

2026-08-20 to 2026-11-17 · UTC publication dates

Coverage begins 6 Apr, 14:37 UTC

Follow the documented timeline or explore the related reporting.

What happened

The facts
  1. Artemis II crew to return to Earth on April 10, 2026

    The Orion capsule carrying the Artemis II crew is returning to Earth after its lunar flyby. The spacecraft is expected to splash down in the Pacific Ocean near San Diego on April 10, 2026, approximately nine days after launch. The return journey will take approximately four days.

    1 corroborating report

  2. Artemis II conducts six-hour lunar flyby of far side of the moon

    The Artemis II crew conducted a six-hour flyby of the moon, passing as close as 4,070 miles to the lunar surface. During the flyby, the astronauts observed the lunar far side, including the Orientale Basin and Apollo 12 and 14 landing sites, and photographed areas of the moon never before clearly seen by humans. The crew experienced a total solar eclipse from their vantage point behind the moon.

    1 corroborating report

  3. Artemis II crew surpasses Apollo 13 distance record from Earth

    NASA astronauts Reid Wiseman, Victor Glover, and Christina Koch, along with Canadian Space Agency astronaut Jeremy Hansen, flew their Orion spacecraft beyond 248,655 statute miles from Earth on April 6, 2026, breaking the distance record set by Apollo 13 on April 11, 1970. The crew surpassed the previous record by approximately 4,100 miles.

    1 corroborating report

  4. Artemis II crew trained for nearly four years to prepare for lunar mission

    The four astronauts of Artemis II underwent approximately four years of training in preparation for their historic lunar flyby mission. Training included extensive study of lunar geography, observations of solar eclipses, and familiarization with scientific objectives including mapping and photographing the lunar surface.

    1 corroborating report

  5. Artemis II represents first crewed lunar mission since Apollo 17 in 1972

    The Artemis II mission marks NASA's first crewed return to the moon since the Apollo era. The mission is part of NASA's Artemis program, which aims to establish sustained human presence on the moon. Future planned missions include Artemis III in 2027 for additional lunar orbit operations and Artemis IV in 2028 for the first crewed landing near the moon's south pole.

    1 corroborating report

  6. Artemis II crew begins return journey from lunar space

    On April 7, 2026, the Artemis II spacecraft began its journey home at 1:25 p.m., departing the moon's gravitational influence and initiating its trajectory back to Earth after completing the historic lunar flyby.

    1 corroborating report

  7. Artemis II crew executes historic lunar flyby on April 6

    The four-person Artemis II crew conducted a seven-hour lunar flyby beginning at 2:45 p.m. EDT on April 6, 2026. During the pass, they observed the lunar far side and near side, conducting detailed scientific observations of 30 different target sites including Orientale Basin, Hertzsprung Basin, and the Aristarchus Plateau. The crew worked in rotating pairs in 55-to-85-minute observation shifts.

    1 corroborating report

  8. Artemis II crew reaches record distance from Earth of 252,757 miles

    The four Artemis II astronauts reached their maximum distance from Earth at 252,757 miles (406,772 kilometers) at 7:05 p.m. EDT on April 6, 2026, surpassing the previous record of 248,655 miles set by Apollo 13 in 1970 by approximately 4,100 miles.

    1 corroborating report

  9. Artemis II spacecraft scheduled to splash down in Pacific Ocean off San Diego

    The Artemis II spacecraft is scheduled to splash down in the Pacific Ocean off the coast of San Diego at 8:07 p.m. on April 10, 2026, concluding the 10-day mission that began with the April 1 launch.

    1 corroborating report

  10. Artemis II crew enters lunar space for first time in over 50 years

    NASA astronauts Reid Wiseman, Victor Glover, and Christina Koch, along with Canadian Space Agency astronaut Jeremy Hansen, crossed into the Moon's gravitational influence at approximately 12:41 a.m. ET on April 6, 2026. This made them the first astronauts to enter lunar space in more than 50 years, becoming only the 28th humans to cross this threshold.

    1 corroborating report

  11. Artemis II achieves closest approach to lunar surface at 4,066 miles altitude

    During their lunar flyby on April 6, the Artemis II crew reached their closest approach to the Moon's surface at approximately 4,066 miles (6,540 kilometers) altitude at 7:02 p.m. EDT. This distance is significantly farther than Apollo missions, which flew approximately 70 miles over the lunar surface.

    1 corroborating report

  12. Artemis II astronauts observe total solar eclipse from lunar vicinity

    The Artemis II crew observed a total solar eclipse from space during their lunar flyby on April 6, 2026, as the sun, moon, and Orion capsule fell into perfect alignment. The eclipse began at 8:35 p.m. EDT and concluded at 9:32 p.m. EDT, allowing the astronauts to study the sun's corona and observe the sun's ability to disperse moon dust.

    1 corroborating report

  13. Artemis II crew experiences communication blackout as moon blocks radio contact

    During the lunar flyby on April 6, 2026, the Artemis II crew lost radio contact with NASA Mission Control for approximately 30 to 50 minutes beginning at 6:44 p.m. EDT. The blackout occurred when the moon's position moved directly between the Orion spacecraft and Earth, blocking radio transmissions. The crew continued conducting lunar observations and photography during this period.

    1 corroborating report

  14. Artemis II crew carries Apollo 8 silk patch to the moon

    The Artemis II astronauts brought the Apollo 8 silk patch that originally accompanied Jim Lovell to the moon during humanity's first lunar visit in 1968. The crew displayed the historic patch as they prepared for their lunar flyby, treating it as a symbolic connection between past and present lunar exploration.

    1 corroborating report

  15. Artemis II crew witnesses total solar eclipse from behind the moon

    The Artemis II astronauts observed a total solar eclipse from their vantage point behind the moon, an astronomical event that was ensured by the mission's launch timing on the previous Wednesday. This rare perspective allowed the crew to witness the moon blocking the sun and exposing its corona.

    1 corroborating report

  16. Artemis III planned as next crewed mission with lunar lander docking practice

    NASA plans to conduct Artemis III in the following year after Artemis II, with another Orion crew practicing docking with lunar landers in orbit around Earth. The culminating moon landing by two astronauts near the moon's south pole is scheduled for Artemis IV in 2028.

    1 corroborating report

  17. Artemis II uses Apollo 13's free-return lunar trajectory for moon flyby

    The Artemis II mission employed the same free-return lunar trajectory maneuver that Apollo 13 used after its oxygen tank explosion. This orbital path takes advantage of Earth and moon gravity to minimize fuel consumption and automatically guides the spacecraft on a course back to Earth after passing the moon.

    1 corroborating report

  18. NASA receives final message from Apollo 13 commander Jim Lovell before Artemis II flyby

    The Artemis II crew received a recorded wake-up message from Apollo 13 commander Jim Lovell, recorded two months before his death in August 2025. Lovell, who also flew on Apollo 8, welcomed the crew to the lunar neighborhood and encouraged them to enjoy the view during their historic mission.

    1 corroborating report

  19. Artemis II mission represents NASA's first crewed return to moon since Apollo 17 in 1972

    The Artemis II mission marks NASA's first return to the moon with astronauts since the Apollo 17 mission in 1972. The crew of three Americans and one Canadian conducted a lunar flyby and gathered observations to support future lunar landing missions.

    1 corroborating report

  20. Artemis II completes six-hour lunar flyby at closest approach of 4,070 miles

    The Orion spacecraft carrying the Artemis II crew passed within 4,070 miles of the moon during their historic lunar flyby. The crew traveled at a speed of 3,139 mph at the point of closest approach and conducted intensive observations of lunar geography, including the Orientale Basin, Apollo 12 and 14 landing sites, and the south polar region.

    1 corroborating report

Read the coverage